-Construction period: On March 12, 2013 to December 10/02/2015, of which: + Construction and dredging the channel from 12/03/2013 to on 10/02/2015 (contract number SG-019 signed on 12/12/2012) + Construction of sand supply for coffer from 04/09/2013 to May 21, 2014 (Appendix No. 1 signed on 20/09/2013) + Construction of dredging the basin come from 1st batch ship 30/04/2014 to date 04/06/2014 (annex No. 2 signed on 24/04/2014) + Construction of dredging the basin turned on 02 batch ship from 15/11/2014 to 2015/01/02 (mail bid signed on 17/11/2014)