-Transformer station: substations are planning the power supply-pressure 22/6/0, 4KV. In front of the station often slow operation well go the voltage 6KV, later when the grid dedicated to transport hàiủi in going to 22KV go 22KV voltage without transformer replaced. Scheduled build 14 substations 22/6/0, 4KV (kios sealed type) include 1, 1 2x560KVA station 750KVA station, 560KVA station 1 and station 11 400 KVAT