The request is treated as arising in the case after the two sides signed confirmation blueprint for the project, but added more than 25 new reports have been consistently reported.
The cost incurred is calculated based on base working minutes and cost both sides agreed at the time they arise.
đang được dịch, vui lòng đợi..
