2. The investor considering the option proposed by the contractor OEC and choose the optimal Variant. Appointed official bids and sign contracts with the contractor OEC to make the whole package under both steps (or contracted to follow every step): -Bước1 consulting survey, record-setting construction drawing design (PREPARE), please allow the deal XD Ben 1000 DWT barges; -Step 2. Construction of 1000 DWT barge dock.
đang được dịch, vui lòng đợi..
