CONSTRUCTION MEASURESCategories: Tester Line BuildingBuilding work:Project: TC Motor Vietnam1. Preparation:-approved construction drawings-materials (bricks, sand, xi): sand used is clean, smooth sand impurities not satisfactory execution; clean water retrieved from borehole water source of standard area-construction tools, rulers, Plumb, measuring and mixing mortar barrels, containers, trough Lake-position the building location: flicking ink heart, fixed dóng Plumb according 2-measurement: using the mortar mixer 250l; 1 bag of xi, equivalent to 1 barrel of sand (1000x1000x170) mm flat surface to plaster or wooden boardwalks-rate levels are glued on the surface of the mixer2. The order of construction:-surface hygiene Foundation beams, adjacent building blocks-Ho class petroleum before plastering construction-brick masonry must be moistened prior to construction, construction of the mortar must be mixed according to the rate levels.-proceed straight brick building, built: do not coincide, 3 brick layer circuit tube so enraged 1 brick layer card, grout equally (1 cm: 1, 5 cm) vertical and horizontal grout filled;, neat grout-long steel gauge whiskers (length 400 mm, 500 mm), steel bending beard hook-The location of bricks wait pour BT sealed stucco to column3. Measures for storm:-Height wall built to make sure the size of your wall so enraged-watering: bright 1 times 1 times both sides-construction of the wall is watered in within 3 days4. hand hygiene by:-cleaning of outdoor mortar fall bottom-hygienic construction toolsCommander of construction supervision
đang được dịch, vui lòng đợi..