Locate the works; Build the navigation system (extra mold) tim online buildings, building the size of sea water, the warning, directed the construction of suitable, convenient for construction. Build temporary piers and 2 cases (2 side stones framed for embankment) the banks finished complete with Online topics. Unloading supplies and material from Ponton down at location serves construction (on the dock)
đang được dịch, vui lòng đợi..