Article 8: the rights and obligations of the owner8.1. The rights of the ownera) suspend construction works and remedial requirements when the contractor violates the provisions on quality, safety, sanitation and security, fire and explosion prevention order.b) check the quality of the work done by the contractor but not impede the normal operation of the contractor.c) other rights set forth in this agreement as well as the provisions of the law.d) other rights prescribed by law.8.2. Obligations of the ownera) timely provision of design profile and related documents, materials (if any) as agreed in the contract and the provisions of relevant laws.b) delivered by contractors for construction management, use the match schedule, and the agreement of the contract.c) implementation and supervision and other relevant provisions of the law.d) arranged funds for payment to the contractor according to the payment schedule in the contract;e) consider and approve promptly in writing the proposals related to the design, construction of the contractor during the construction works. Timely resolution of problems in the process of construction;f) deployed officers monitor the timeliness of processing checks, validation model contractors providing supplies to the scene, signed and endorsed the workload, the minutes of trials at the scene, Signed and validated when the contractor signing the record within 24 h;g) payment to the contractor the right agreement in the contract;Article 9: rights and obligations of the contractor9.1. The rights of the contractora) propose to the owner about the mass arising out of the contract; refuse to perform work beyond the scope of the contract without the two sides and the unlawful request of the owner;b) changed the measure of construction after being approved by the owner in order to accelerate the progress, quality assurance, safety, performance of works on the basis of the price of the contract has been signed.c) Stop and suspend construction when it has not received the advance, timely payment as required by the contract; Pause execution and does not count the time when the work progress is not the investor experience and timely volume confirmation of owner supervision officers (from time to time send a dispatch notification to the owner).d) require the owner to create all the conditions on the ground in construction;e) suggestions and recommendations directly to the investor representatives when the condition does not warrant for construction contractors to perform at the scene, the settlement is not the right time to accelerate progress.f) requires the Board to command The process of contact and continuous connection with the owner in the construction time, 9.2. Obligations of the contractora) contractor to provide manpower, material, machinery, construction equipment and other related physical conditions sufficient number and types according the contract to perform the work according to the signed contract content;b) contractors must execute proper construction design, project standards, standards, standards of construction, quality assurance, schedule, safety, environmental protection and prevention of fire and explosion;c) contractors must establish measures for construction organization, construction works, making payments, complete the profile setting, set the contract settlement, in accordance with the provisions of the contract;d) plan and 24 h in advance for the owner the work involved in the process of construction that contractors need the owner to arrange from outside, at night.e) Himself arranged the camp Shack, power and water to the construction schedule;f) payment using electricity, water, ... in the process of the construction of the contractors under the regulation or agreement between the parties.g) asset protection, materials, machinery and construction equipment during the construction to completion and delivery to the owner.9.3. the personnel of the contractorContractor's personnel must have the qualifications, skills and experience fit on career, their work. The owner may request the contractor to replace any personnel of the contractor in the market if the person: is the wrong attitude or lack of careful; lack of capacity or need; fail to comply with any provision of the contract.9.4. Conditions on the marketContractors are considered to have and look at the fields, the area around the market, the data and information available above, and have been satisfied before the submission of the bid, including:a) topography of the school, including the geological works;b) hydrological geological conditions and climate;c) the level and nature of the work and materials needed for the construction, completion of works;d) the provisions of the law on labour;e) the requirements of contractors on the route, accommodation, facilities, human resources, transportation, electricity, water and other services.Contractors are considered to have been satisfied about the computer properly and enough of the market conditions to determine the contract price.9.5. The way and means ofa) the contractor shall bear the entire cost (if any) to the right of the go back c
đang được dịch, vui lòng đợi..