Apply loading and unloading
The load must comply with the instructions in the design of the packing material, on time and on load.
Frequently observed not see water escaping. Pore from soft ground to bounce up and then pressed scope embankment flow through vertical groove system.
STEP 1: Preparation
- Cat (land) used for load is transported by car, dump available on the ground need to load.
Step 2: Substance load
- Apply sand (soil) load on the ground loading manually.
- When the speed exceeds 10mm subsidence / day and horizontal displacement rate exceeding 5 mm / day then stop and ask for directions constructed by engineers.
Step 3: Wait for preloading
- Standby time load is determined according to the technical design, project management segments determined by the drawing up technical part Soil Treatment weak.
Step 4: Unloading
- The unloading is performed only at the end of the pending settlement as directed by the technical design. For roads with drains must be approved by the engineer.
- Note: During the construction process, within 1m around the equipment, monitoring instruments, contractors will plug signboards, fence and no use of heavy equipment in the foregoing.