Concrete offers to the market should be regulated slump, so to have people constantly test the concrete. This is an important factor to decide the quality of the concrete.-Time to pour the concrete does not exceed 4 hours.-Concrete pour Tube are sealed, water ways, long enough to the bottom of the pit.-The mouth of the tube pour concrete drill hole 25 cm bottom way.-Do not pull the tube up from concrete block in the pile.-Concrete continuous pour to the top of the pile.* Handle the recovery of bentonite: -Bentonite after withdrawal and many impurities, density and viscosity. So the Bentonite drilling holes up from the bottom to grab quality assurance to take back the right to reprocess. Thanks to a screening using centrifugal vibration strength, soil concentrations of debris in solution of bentonite will be reduced to the levels permitted. -Bentonite after handling must achieve the following indicators:-Density below 1.20-Viscosity Marsh from 35 (90 seconds-Sand content does not exceed 5% of the-The cup of water is under 40cm3The thickness of the wall layer (cake) is smaller than 5 mm.II. 5.3.1 Withdraw the tube walls:-Because the pile through the layer of soft clay layers and plastic mix clay mixed the hard plastic tube should only be withdrawn after the wall of concrete that has the security (after at least 4 h since poured concrete-finishing)-In this final phase, the stands, floor work, reinforced anchor into wall tubes are removed, the tube walls pull up slowly by cranes, to pull upright to avoid cause of early cardiac move piles. Should add a vibration equipment into wall tubes to the withdrawal of the tube walls is easy. Not cause bottleneck phenomenon in the neck where the hose ends pile walls. After the withdrawal of the tube wall is filled up into the sand pit piles if the pile depth, fill the pit collecting Bentonite to create makeshift roadblocks, flat surface to protect the pile. Not allowed in the vibration or other pile drilling within 24 hours from the end of the concrete pour pile in the range of 5 times the diameter of the pile.
đang được dịch, vui lòng đợi..