Reference paragraph 8.2 [time to complete] of the contract; Pursuant to the actual situation, the conditions of using the construction market, contractors were calculated and reset the progress for the need to treat the soil weak. We are pleased to report to you The some issues as follows:Up to this point, the contractor has to get 6 for ground segment construction with a total length of 2043m/6418m/CW3A package for both CW4A. According to the technical requirements of the project, in the course of the road need to perform background processing, the time to download and wait for the development of a minimum of 8 ~ 9 months depending on each area. The time required to execute the above structure (drain, road and background layers, etc.) a minimum of six months. Therefore, the time required to execute the path in the paragraph is background processing a minimum of 14 ~ 15 minutes.With that, the associate contractor Please note to investors that to complete the projects as designed and in accordance with the contract, the construction work in the area to handle the weak soil must be handed over to the contractor before the date 01/08/2015. If the above mentioned period, the contractor must be extended time to complete package or need to change the background process engineering solution. The contractor would receive the respect, the support from you Ban created favorable conditions for us to complete the project according to the schedule already committed.
đang được dịch, vui lòng đợi..