8. Measures for waterproofing hot water.-Works: according to a recipient using the console-Peel the excess concrete Chisel, cut off a deep iron ti-Lack of concrete peeling Coating, concrete pour, pitting large errors.-Conducting surface casing filling of the banks, the hole ti iron.-Filling of the insulating handle patch neck tube technique.The construction steps: -Handle the trans tube stock deck waterproofing+ Cut off neck offsets the floor collect water+ Wide pipes around the neck toilet from 5-10 mm from the pipe neck mộp.+ Around the technical area waterproofing membrane with adhesive+ Coating waterproofing membrane part up around the neck when rolling technique of waterproof tube.-Waterproofing walls and bottom of the tank:+ Check out the bathroom, using the for and the bottom of the tank to ensure clean dust and grease stains+ Rolling or spraying of coatings on the surface of the floor and wall, hot+ Paste grid reinforcement and sprayed the second layer+ Check, review all of the cracks and handed back to the owner.
đang được dịch, vui lòng đợi..