-Gas pipeline has many different diameter must be insulated wrap. If the gas pipes go on the wall must be buried, when going out of the ceiling must be hung by the proper hanging device, when going out must be placed in the trough the trunking by religious.-Condenser cooling Rig by wind and condensation of air conditioning equipment must choose to output to heat condensation do not exceed temperature of 52oC when wind is 35oC.-Condenser cooling equipment by wind must be suitable for outdoor installation. The equipment, compressor, condenser coil, fan guard shell rig, safety and control devices, pipes and all the elements that can reach in resistant sheath.-The compressor must be a kind of pit-Tong, spiral and is kind of enclosed, sealed again. The compressor must be mounted inside the motor protection, lubrication, suppressor, the crank, and heat the inner vibration reduction.-Rig is winged tube type condenser and the fan must be the type of propeller or centrifugal type coming under the blows standing. The refrigerant circuit will be fitted with hinged cold, be more complete fuser cartridge types agent can be replaced new, along with the van blocked the road connecting off va.-The fin must be set to the correct position as on the approved design drawings. The space between the minimum 0.5 m hot rig to ensure the cooling process and protect the value of the repair.-Stands for hot must rig properly required of approved design drawings to ensure correct functionality of it as firm, drainage.-System control signal wire will be connected from the hot to the cold offshore rigs by sequential methods by line noise.
đang được dịch, vui lòng đợi..