B. / CONTRACTOR BMB:
1. / The replacing other methode color is not yet completed (scheduled for completion 10/02/2016)
2. / The methode incomplete sanitation.
3. / The repair defect list ongoing.
C. / CONTRACTOR ERATECH:
1. / Unfinished work pumping water into the tank
2. / Unfinished work water test system
3. / Unfinished work of painting the outer tank
4. / unfinished work patching the paint sludge press.
5. / the surrounding area sanitary construction
D. / CONTRACTOR OPENING ANALYSIS:
1. / unfinished work patching paint component
2 / Never test kiln capacity 4t
3. / the surrounding area sanitary construction