Design drawings 4th floor duct system can perform wind tunnel passes position 4 floor down to the 3rd floor level (please see attachment). However when the actual inspection conducted off-site, and simultaneously test the 4th floor structural drawings, we do not see the floor show opening for the position of this duct
đang được dịch, vui lòng đợi..
![](//viimg.ilovetranslation.com/pic/loading_3.gif?v=b9814dd30c1d7c59_8619)