SUBJECT TO APPROACH IN THE EXECUTION OF THE WORK TO DIG THE SOILI. GENERAL REQUIREMENTS1. Workers working on construction sites must have the following criteria:-Enough working age -Must be a health examination by circular 14/2013 BYT (06/05/2013)-Receive training on OCCUPATIONAL SAFETY fit each industry circular 27/2013 MINISTRY CHRISTOPHER DESRIAC (on 18/10/2013)-Must be equipped with a full range of personal protection means is suitable with conditions of employment according to circular 04/2014 MINISTRY CHRISTOPHER DESRIAC (on 12/02/2013)-Must have a degree, a certificate of professional training by trades.-Buy workers ' compensation insurance-Not drinking beer before and during the working process. 2. equipment, construction machinery, must have the following criteria:-Equipment, machines are SUBJECT to strict requirements must be calibrated according to circular 04/2014 MINISTRY CHRISTOPHER DESRIAC.-Must be buying insurance, equipment and machinery.Must-have equipment operating logs, machinesII. CONSTRUCTION -Comply with the construction projects have been browser owner Training ground by excavators:-When operating the excavator and the move to full implementation of the common rules such as:Check the condition of the machine.Check your placement.For the test run does not load.Hand over your employment status for the ca must record in the shared delivery of the machine.-Put your Background must be stable, flat; If the weak must be lined with steel adapter plate -During operation, all the people walking on the roof of natural slopes as well as within the radius of the machine.-Prohibit the person no duty to climb the excavator when it is working.-In any case, the distance between the excavator cabin bucket digging pits and 1 breathtaking not less than 1 m.-Only for excavators working on at night or fog when has ensured adequate lighting.-When are digging if seen, toxic gases must immediately cease construction immediately and workers right out of the dangerous place until the reducing measures out toxic gases.-Extra air workers must do their duties properly in the location of the work has been delivered.-In the area are excavating the land must take measures to drain standing water (even when the rain) to avoid water flowing into the pit dug into the peach pit landslides do.-When the control bucket to pour the ground to turn cars into the bin holders through the rear wheel and bucket standing in between. Then lower down slowly to dump buckets of soil -Non driver bucket through the cockpit-Non driving workers sitting in the cockpit when the excavators are poured into the land.-Do not change the tilt of the excavator bucket while carrying load -Not be adjustable phang, when bucket is spinning or load bearing holders. Not siege phang suddenly.-Digging Hole must be done Rails protect and warning signs-The railing height must have from 1 to 0 m, 15 m above the floor-The railing system catches within not more than 3 m.-When stopping work to move the excavator off the floor and lower mirror holders down to Earth. Only clean the bucket when the bucket down and down you're setting up. SUBJECT TO APPROACH IN THE EXECUTION OF THE WORK TO DIG THE SOILI. GENERAL REQUIREMENTS1. Workers working on construction sites must have the following criteria:-Enough working age -Must be a health examination by circular 14/2013 BYT (06/05/2013)-Receive training on OCCUPATIONAL SAFETY fit each industry circular 27/2013 MINISTRY CHRISTOPHER DESRIAC (on 18/10/2013)-Must be equipped with a full range of personal protection means is suitable with conditions of employment according to circular 04/2014 MINISTRY CHRISTOPHER DESRIAC (on 12/02/2013)-Must have a degree, a certificate of professional training by trades.-Buy workers ' compensation insurance-Not drinking beer before and during the working process. 2. equipment, construction machinery, must have the following criteria:-Equipment, machines are SUBJECT to strict requirements must be calibrated according to circular 04/2014 MINISTRY CHRISTOPHER DESRIAC.-Must be buying insurance, equipment and machinery.Must-have equipment operating logs, machinesII. CONSTRUCTION -Comply with the construction projects have been browser owner Training ground by excavators:-When operating the excavator and the move to full implementation of the common rules such as:Check the condition of the machine.Check your placement.For the test run does not load.Hand over your employment status for the ca must record in the shared delivery of the machine.-Put your Background must be stable, flat; If the weak must be lined with steel adapter plate -During operation, all the people walking on the roof of natural slopes as well as within the radius of the machine.-Prohibit the person no duty to climb the excavator when it is working.-In any case, the distance between the excavator cabin bucket digging pits and 1 breathtaking not less than 1 m.-Only for excavators working on at night or fog when has ensured adequate lighting.-When are digging if seen, toxic gases must immediately cease construction immediately and workers right out of the dangerous place until the reducing measures out toxic gases.-Extra air workers must do their duties properly in the location of the work has been delivered.-In the area are excavating the land must take measures to drain standing water (even when the rain) to avoid water flowing into the pit dug into the peach pit landslides do.-When the control bucket to pour the ground to turn cars into the bin holders through the rear wheel and bucket standing in between. Then lower down slowly to dump buckets of soil -Non driver bucket through the cockpit-Non driving workers sitting in the cockpit when the excavators are poured into the land.-Do not change the tilt of the excavator bucket while carrying load -Not be adjustable phang, when bucket is spinning or load bearing holders. Not siege phang suddenly.-Digging Hole must be done Rails protect and warning signs-The railing height must have from 1 to 0 m, 15 m above the floor-The railing system catches within not more than 3 m.-When stopping work to move the excavator off the floor and lower mirror holders down to Earth. Only clean the bucket when the bucket down and down you're setting up.
đang được dịch, vui lòng đợi..
