Section 4
IMPLEMENTATION AGREEMENT WIRING
Article 43. The right of access equipment at the connection point
power transmission unit and customers wishing to have access connected devices at connection points in the survey process to Connection plan, design, construction, installation, testing, inspection, replacement, dismantling, operation and maintenance of the equipment connected.
đang được dịch, vui lòng đợi..