Execution of test 4 position to test the ability to operate and capable of building the hammer in the strata, however while operating at full capacity, but the depth closed only 19.74 ~ 25.04m achieved, not achieved pm 29.04m deep design. Simultaneously machine constantly having problems with the gas system, the voltage due to overload.
đang được dịch, vui lòng đợi..
