6.7.8 updated the maintenance procedures The work and the frequency of inspection and maintenance are listed above are just general guidelines. Once available, the recommendations for operation and maintenance, the requirements of different providers (e.g. manual operation for operation and maintenance of the engines, gear boxes, brakes, monitoring equipment, emergency diesel generator, butterfly valves in hydrants and hoses type operating mechanism etc.) need to be reviewed and merged. Only if the specific operating procedure (or plan to work) for each category of major equipment such as elevators, the electrical, doors, walls, valves in hydrants pipe type etc. has been prepared.6.8 requirements for the operation and the instructions Detailed operation procedures must be built as soon as the design is validated and when the operating manual for operation and maintenance of the related equipment from suppliers. This section provides some general instructions. For each position of the device (for example, the overflow of the dam, hydrants in the dam to lower the water level) procedures must be prepared for all of the following scenarios:-Doors operate with the main power supply-remote controls or controls in place;-Doors operated by diesel backup power supply-remote controls or controls in place;-Operate the emergency doors. In addition to providing operational procedures required for the following:-Installation and remove the glow of the walls;-Operate the diesel generator backup power supplies and transfers.-Cleaning the louver bin hydrants. However the General procedure is described in the sections below as the basis to develop the procedure for operating the specifics when the drawings and documentation manuals of the manufacturer, be aware that the following prerequisites before you apply for all the procedures:-Manpower: validate capacity, is recorded in company competence registration, have passed the level of technical and commercial personnel training by the company in the technology of hydraulic power.-Reference material: the material operating instructions of the manufacturer.-Preliminary action: before starting the procedure of operation, the operating personnel must receive instruction of officers to operate power plants and then visually inspect the door lifting devices to verify that they are in good working condition.6.8.1 the sugar spills-general operating procedures Try to continue the operation of the door the way the spill using redundant diesei generator powera) implemented procedures for diesel generator auto start.b) test emergency power supply.c) reservoir water level Reading from the table of norms to decide to open flushing at the request of officials operating the plant.d) press the button control to open the overflow on the console to open the on-demand. During the opening notes the current and voltage of the power. At the same time observe the water flow through the door way tore down the area beneath the hot pepper and recording any abnormality whatsoever. Click the stop control button when the door has reached the required aperture is expressed on the designated location of the door.e) restore normal power supply. Shut down the generator and put in automatic control mode.f) notes that the operation was carried out in operational log book-shop.g) reported the completion of the procedures for operating the plant. Test preparation/maintenance of the door the way the spilla) inform staff of factory outlet of the septum of the spill will be built/entered.b) confirmed the door overflow line was closed completely.c) press the closing control baffles and confirmed the engine pulley was stopped when the designated stop line placement faint only to zero.Usually manually insert the lower bulkhead in place with cranes.d) if applied early cable and lock, barrier controller to indicate that are conditioned to allow active and not active. When applied to any physical area, required the bulkheads do not impact, e.g. remove the glow plugs engine, a manual of operation.e) Sealing and locking the controls the bulkhead to indicate that they are conditioned to allow activity.f) notes that the operation was carried out in operational log book-shop.g) reporting process to staff operating the station. The procedure for bringing down the backs of the safe operating conditionsa) announcements for staff operating the plant about the barrier will be opened and the overflow will return to normal operating conditions.b) confirmed the septum and the spill has been completely closed or not, close them by pressing the close control and review the winch motor is stopped when the designated location of the baffles open only to zero.c) Insert gaps between walls and doors the overflow.d) When the water level between the septal and mouth of the overflow by water reservoirs, press control key to open and determined that the door completely open and water flow through the mouth of the overflow, or lift the baffled by cranes for the manual operating bulkheads.e) notes that the operation was carried out in operational log book.f) reporting process to staff operating the station. Emergency spill way gate operators The procedure for operating the emergency spill way gate must be constructed carefully and separately for each device's design and installation characteristics. Each procedure to consider cases of clogged doors, there in the door caused the closure and operate the door in the prospect of peak discharges.6.8.2 procedures hydrants Operating procedures of the hydrants, used diesel generator power backupa) implemented procedures for diesel generator auto start.b) test emergency power supply.c) press the control button to open hydrants on the console to open the on-demand. During the opening notes the current and voltage of the power.d) Press the stop control button when the door has reached the required aperture is expressed on the designated location of the door.e) restore normal power supply.f) turn off the generator and put in automatic control mode.g) notes that the operation was carried out in operational log book-shop.h) reported the completion of the procedures for operating the plant. Test preparation/maintenance of hydrantsa) announcements for staff operating the plant about hydrants will be closeb) press the closing control baffles and validation engine winch was stopped when the designated location of the baffles open only to zero.c) Sealing and locking the controls to indicate that they are conditioned to allow active and not active.d) press the closing control baffles hydrants and confirmed winch motor stoppede) if applied early cable and lock, barrier controller to indicate that are conditioned to allow active and not active. When applied to any physical area, required the bulkheads do not impact, e.g. remove the glow plugs engine, a manual of operation.f) notes that the operation was carried out in operational log book-shop.g) reporting process to staff operating the station. The procedure to put the hydrants on the safe operating conditionsa) inform staff of factory of baffled hydrants hydrants will be open and will return to normal operating conditions.b) confirmed the septum and the hydrants had been completely closed or not, close them by pressing the close control and review the winch motor is stopped when the designated location of the baffles open only to zero.c) inserts a space between the septum and hydrants.d) When the water level between the septal and hydrants in above the reservoir, press the control key to open and determined that the door is fully open and the water flows through the hydrants.e) open the hydrants to flooding to drain the tube tunnel and/or hot sand discharge, and this is done when perfectly open hydrants.f) notes that the operation was carried out in operational log book.g) reporting process to staff operating the station.6.8.3 procedure for operating the sluices Procedures of sluices using diesel generator power backupa) implemented procedures for diesel generator auto start.b) test emergency power supply.c) reservoir water level Reading from the table of norms to decide to open flushing at the request of officials operating the factory
đang được dịch, vui lòng đợi..
![](//viimg.ilovetranslation.com/pic/loading_3.gif?v=b9814dd30c1d7c59_8619)