Dismantling the scaffold of the RC structure, is allowed only after the concrete reaches the intensity as (as a percentage compared to the intensity of the design)
Dismantling the bearing of the RC scaffold structure, only after the concrete is allowed to reach the intensity as follows (expressed as a percentage compared to the intensity of the design)