As per the aforementioned letter, the Contractor Daelim has requested subcontractor BRE17 to speed up work program for construction drawing designing and complete this item on the end of October 2015. However, the designing subcontractor-Britec withdrew from the Project, the Bridge Enterprise 17 tried to find a new designing subcontractor and sign the contract to expedite work program, the designing work will cost nearly twice as much as the original designing cost. Bridge Enterprise 17 will try to meet the work program of designing as required by Contractor Daelim and finish it on the end of October 2015. Nevertheless, with some difficult items and site plan have not been cleared such as 2nd Ring Road Bridge, Nhue Bridge, we would like to delay the completion of these items until December 2015 (Please see the attached work program for construction drawing submission).In fact, the work program of design made basis of the non-existent interface problem with other packages and failures of technical design that both the Contractor and the Subcontractor Daelim BRE17 are not able to dispose it. Thus, the work program can be able to adjust according to the unity of the all parties.We respectfully propose Daelim Contractor to consider and approve this work program for construction drawing design.
đang được dịch, vui lòng đợi..
![](//viimg.ilovetranslation.com/pic/loading_3.gif?v=b9814dd30c1d7c59_8619)