Pour sand under the scheme were calculated prior to the thickness of each layer was the contractor's proposal at 25cm before the roller compaction construction methods try, construction sand embankment road grade, combined with the earth embankment slope to it. To avoid moving machinery construction directly on the surface of geotextile, proceed towards construction and construction methods as part of construction sand drainage layer first.