Dig, dig roof River embankment, toenail digging embankment, pile of bamboo, which lay a bamboo straw grip jigsaw embankment Foundation and water collecting grooves from pile to pile 9 14 (left)
Digging the river, digging embankment roof, peach palm nail, piles of bamboo, straw clamp a bamboo fence transplant foundation embankment and ditch water from pile to pile 9 14 (left line)