II implementation process
in the order includes the following steps:
1. Surveying the actual situation on the rig, combined with parts related functions on the rig for detailed construction plan for each room, each specific region.
2. Identify areas tiled preparation for implementation, the workload can be completed according to the requirements of rig time (about 04 hours) for each region.
3. To dismantle the equipment in the area have been identified and the move away from the construction area
required tools: tuocvit, key rings, drill, screw head shot ...
4. Sanitary floor area is defined by floor cleaner, wipe off dirt, oil and grease (if any), then proceed to dry. Tools needed: buckets, brooms, mops, towels, floor cleaner, vacuum cleaner, blower ...