• Proceed to hand over the construction work in the field.
• After receiving the B ground conducting construction organization lake constructed in accordance with design, to check the difference in the size of the scene and design documents.
• Arrange shielding the surrounding area is not constructed.
• The Vandal dismantling:
- Review design documents carefully before smashing performance, conduct, shielding dust isolated other parts, collecting debris piled into bags and transported to the gathering place;
- Dismantling of the equipment must be very careful to avoid damage if it is capable of re-use, the device must be removed handed over to the investor.