General Electric load needs to be established on the basis of the ground construction, the volume of construction and construction measures primarily, is divided into 3 areas: the public works quarry, and the auxiliary energy, housing and public works (near the location of the 220 kV distribution station)
đang được dịch, vui lòng đợi..
