4.5. The summationIn limit analysis on infrastructure Advisor, had using slightly higher in the middle of the parameters the train of the same type (angle α and β, the coa of the motion axis Hp and Hs), in addition, the ship's altitude above the Rails had to be raised just right (as of an average elevation of traditional tube mounted on the roof a/c) , news from about 3700-3800.This plan has many corners have a radius of curvature equal to 100 mm, which ship recommendations consistent with the route of the 5 contractors, train length and location reviews have different navigation, but when larger tunnel diameter 5,600 mm, the type of ship can run smoothly inside the tunnel Figure 4.6-1, reference, Also the figure that the train stops at the station, see Figure 4.6-2.In addition, gear bent glass too small will cause effects on the mounting rail power supply. The top of the ship to "sweep" in the range of 200 mm-300 mm beyond the curve (except for the mobilization of the ship), therefore, the need to adjust the position of the power supply Rails.4.6. additional presentation on the limit analysis
đang được dịch, vui lòng đợi..
![](//viimg.ilovetranslation.com/pic/loading_3.gif?v=b9814dd30c1d7c59_8619)