Thanks for the feedback on my emailLike email sent on 17/10/2016, contractors please review carefully the tender attachments include: pdf drawings, the specifications had clearly shown. The contractor is not to change anything in the bid. Scope of work: all included items such as bid sent (except: transformer, capacitor Cabinet, backup generators, lighting) tender of the company we've clearly shown these things. the contractor consider carefully and respond as soon as possible.
đang được dịch, vui lòng đợi..
