* Solution foundations According to the preliminary evaluation, the project area have in geology works very well. Therefore, only use a single nail made of reinforced concrete, the Foundation hole depth 2 m minimum.2. The station: the rows, yard workers, exposed the car deck, walkway
đang được dịch, vui lòng đợi..
