HEAD: EARS-After the concrete one reached the intensity of the scrapped the system of Struts, formwork.-Erection of reinforcement steel, da, formwork phase 2 head-body and ears.-Installation details waiting to execute blocks of no. -Pour concrete cylindrical fuselage phase 2 with a height of H = 4 m head and ears.-Maintenance of the concrete in accordance with the technical requirements.
đang được dịch, vui lòng đợi..