Main Canal irrigation system running along Ngoi As might be affecting the structure, even cause fracture of the channel due to the large trucks off the road causing the vibrations. Material spilled from the truck in the process of moving a potential risk of sedimentation canal, channel structural cracks.
The effects on the LOW and TEMPORARY because:
i) The majority of the works is enforcement in the dry season, so the trucks carrying the material also affects the quality at street
ii) Volume of construction materials and the number of vehicles transporting materials is small, about 15 vehicles 7t / day in peak periods most;
iii) The provisions on the tonnage and speed of the vehicles carrying material are specified to ensure that the problem of infrastructure damage does occur.
Location: Road management and material transport routes and waste materials in Trung Mon, main canal lake Ngoi As
Time: 18 months of construction
đang được dịch, vui lòng đợi..
