1. the required base and the first figures provided by article owner, the base status of natural conditions, the current state of the work, the contractor OEC established technical proposal survey methodology, design, please allow the agreement to build a 1,000 DWT barge dock, preliminary determined costs XD , the progress made.
đang được dịch, vui lòng đợi..
