/Trenching/D1000 tribute put up land
passenger cars
/transportation land located < 2000 m
/land carriage forward located > 2000 m
/Lu lèn-create the trench bottom slopes
/installation of the stats and the other constructions
/
/D1000 pipe laying Up land lu lèn-return the item by 70% by swamp Toad. K95
/lèn lu land Relief-repaid by 30% by the intermittent 9T. K95
MANHOLES/ACCESS OUTDOOR
/TYPE: I (2100 * 220 * 2930)
//
manholes nails Digging Exposed ground up passenger cars
/transportation ground out yards
//
lining concrete Pour Pouring concrete bottom and lid manholes manholes Built brick/
just 75 thick wall Plastering/
mac warrant M75 mortar 2 cm
/land Relief with intermittent Toad repaid using the manholes.K95
/type: II (3000 * 6000 * 325)
/Digging manholes nails
/Gizmos ground up passenger cars
/transportation ground out yards
//
lining concrete Pour Pouring concrete bottom and lid manholes manholes Built brick/
just 75 thick wall Plastering/
mac warrant M75 mortar 2 cm
/land Relief with intermittent Toad repaid using the manholes.K95
/type: III (3000 * 8000 * 325)
//
manholes nails Digging Exposed ground up passenger cars
/transportation ground out yards
/
lining concrete Pour/Pour concrete bottom and lid manholes manholes Built brick/
just 75 thick wall Plastering/
mac warrant M75 mortar 2 cm
/land Relief with intermittent Toad repaid using the manholes.K95
/OUTLET-CURRENCY
//
digging Intermittent background by swamp Toad Dump K95/concrete foundation pads
/steel work (bend-bend steel)
/Transplant erection of formwork for concrete Pouring/
/
remove the formwork