Send Mr Overall
I was checking the records of your acceptance made double box culvert items - Part structures (Depot site)
inspection time before missing a lot of signatures (As attached photo) and you've added very good for this request, however there are still some missing records are as follows:
1. Test records gathering equipment before construction.
2. The transfer and receipt of steel - steel at the scene sampling (Experimental results) for this category (I have not seen any).
3. The transfer and receipt of supplies seam elasticity - for samples (experimental results) in the field (I have not seen any)
4. In section complete test records for structure (Figure profile is painting box culvert single - You should correct this problem) (photo attached).
5. Some signatures missing you added, but you should be careful with their responsibilities (If forging signatures).
Notes: Recommend you soon additional items on - and I continue to thoroughly check more - no problem, I will continue to inform you until the complete dossier.
đang được dịch, vui lòng đợi..
