Note When welding pipe connector we have to knock remove concrete layer lining the tube (if any) way of welding point of at least 20 cm to not affect the weld. Similarly, the external pipe protection layer also need to scrape away at least 20 cm to avoid when South Korea due to the high heat melt the protective layer on the exposed, damage the welds
đang được dịch, vui lòng đợi..
