-For the mine of material not yet exploited the mine location shows the profile required, work with the local governing body of the extraction permit, identify the located (clearly define the type of sugar, sugar level, the length of each level the road...), lab samples, reserves targets Vietnam standard and AASHTO (if PH standards no);
đang được dịch, vui lòng đợi..