• Ensure quality and timely deliverable;
• Providing data to extract value management (EVM) reporting requirements;
• Development of the analysis structure (WBS) for each project and tasks such as warranty;
• develop, coordinate, update and maintain, the system provides tools, all applicable standards operating
procedures;
• ensure adequate documentation standards meeting throughout the software development lifecycle full
(SDLC);
• follow a method of iterative development was approved;
• to manage the proper configuration;
• Ensure compliance with all engines 508 complies with the regulations;
• Ensure compliance with all safety regulations the agency;
• Provide support for staff-related security updates for applications development;
• Mark current prices languages and tools, and recommend to the liaison officer with the technical representative
new languages (COTR) and the appropriate tools;
• Provide information, technical, and management of the COTR briefings and presentations and other staff
as required by the COTR on all aspects of the work is done.
4.2.2 DEVELOPMENT aND SUPPORT APPLICATIONS fOR eXTENSION aND ADMINISTRATIVE
APPLICATIONS aPPLICATION
government has developed several applications for extensions IMPAC II supports extramural business
processes and applications support internal business processes. Contractors will strengthen and support the
production applications and create new applications as needed in place. Work to be performed will focus
mainly on the systems and their components. However additional support systems and development
may be required.
The contractor must:
• Monitor, maintain, consolidate and manage all existing enterprise applications and defects exactly as they
come fame. The software engineering best practices and techniques to be used for applications
such Amendments are being used to develop the new system. All data and programming standards
used and applied in a consistent manner.
• Use an iterative method development for all the work to be performed under this contract. The method will
allow users to check the validity and accuracy of the business requirements and meet the
usability and performance of the new development. User testing and acceptance throughout the development
cycle will detect usability problems, miss the request, and any necessary design changes early in the
process, allowing they are given immediately.
• Identify the risks associated with the development of the new efforts of the software, including system extensions, the
analysis and classification of the level of risk as serious and capable, and identify techniques to
minimize the risks.
• Conduct feasibility studies / cost-benefits, requirements analysis, and all life cycle activities other included in
the design stage, including the use of a technology-oriented subjects such as unified modeling
language (UML), development, implementation and documentation, for the development and
maintenance system for long-term use.
• Collect, develop, and analyze software requirements using a user facilitate sessions.
• develop a business model, identifying the business process (to tank) necessary recommendations to improve the
effectiveness and efficiency for each application, if needed.
• develop "use cases" and define the settings under the provisions of "in kind" for each development stage of each
cycle.
• develop java applications using a service-oriented architecture and web services are applied
• developing applications in a multi-platform environment, using programming object-oriented, with an
understanding of the architecture Internet / Intranet.
• Development of application software for COTR evaluation form.
• Provide graphic design for the application user interface
• Conduct analysis usability and evaluation
• compliance 508 compliance for all development efforts
• use government provided 508 reporting tools to identify and minimize issues 508
• to develop, finance data, and comply with the appropriate configuration and efficient management practices.
• Design the system using rational unified process, or a similar framework with it.
• Support the development of business document cases by providing feasibility and senior business
requirements analysis systems available or new requirements and develop cost estimates.
4.2.3 dOCUMENTATION
the contractor will build the system and who use the documentation for both existing and newly deployed applications
software.
the contractor shall provide the following documents for each application:
• system documentation
• Training documentation
• documentation manual
the contractor shall provide the necessary documentation at each stage completed
project:
đang được dịch, vui lòng đợi..