Adjusted test on DR to just check connectivity only, no checks done on DR transaction because the connection will break synchronous DC-DR was recently tested 27.1 pass completion date. The testing of DC-DR fail over for DCM has been done previously on the DR in the period before the SIT.
- Ko testing are test cases for log information correct test performance because the connection between Apacher Jmeter fault with OmniDocs.
- Additional test NSD change your password
- Additional checks are not allowed to access the system from outside the intranet DIV.
đang được dịch, vui lòng đợi..