TECHNICAL REQUIREMENTS 1. SURFACE (before handing over to the unit waterproof):
All welds and seaming to be very closed.
Steel surfaces must be clean of rust and other impurities.
Fixed PVC pipe steel tube welded to steel wall 150 to 200mm long. Waterproofing Floors and walls STEEL 2. Product mix SPECCOAT PE 145: Pour component A into component B. Use the mixer and stir well until the mixture homogeneous 3. CONSTRUCTION: The first layer: Use brush or roller application SPECCOAT PE mixture onto the surface 145 are steel. 2nd class: 1st class waited dry (about 6 hours, depending on temperature and environment sector construction) continued construction of the 2nd class SPECCOAT PE 145 class 1 and perpendicular WATERPROOFING FLOOR AND STEEL TUBE CROSS CUỐN PVC Pipe Fitting formwork around Fill Sika grout in between the steel pipe and PVC pipe filled Sika PVC pipe around Hydrotite CJ type Sika Pour grout between steel tubes and pipes in PVC sealant pumps Asoflex - PU45 perioral PVC pipe and steel walls Floors and walls WATERPROOFING CONCRETE 1. MASTERSEAL 540 product mix: Pour component A into component B. Use the mixer and stir well until the mixture homogeneous 2. Waterproofing: The first layer: Use brush or roller application are MASTERSEAL 540 mortar surface. 2nd Grade: 2nd class dry waiting (between 4-6 hours, depending on temperature and environment sector construction) continued construction of the 2nd class 1st class MASTERSEAL 540 and perpendicular. DEPARTMENT ENGINEERING CONSTRUCTION CORPORATION SECURITY NEWS
đang được dịch, vui lòng đợi..
