option 1 is the option chosen by the IMC, established prices according to the price of the new real construction items include Larsen (close, spit) + anti-Frame (production, erection and dismantling) according to the norms of the Ministry of construction. browser Price was comparable to the price in the BOQ (including clearing price) and the price to choose the lowest price in the unit price and price-setting in the BOQ (including the clearing price). option 2 that QLXD Room-GT mentioned irrational in that: (i) long Lasen 12 m (18 m for P5 & P6 Thoi Binh bridge) general use 1 story frame against the (can not detach the bracket for 8 m of length according to the TECHNICAL DESIGN; 4 m Larsen Supplement No frame against).(ii) the unit price under the option 1 is the unit price is calculated according to the "total value of money is made from the norm and the unit cost of materials, labor, air at the time of construction of" divided by "the total number of tonnes of Larsen" to determine the price of steel pile siege system (including Larsen and frame against) by unit/lassen tons (as measured in the price bidding in the BOQ). In fact here is the aggregate price of the steel pile siege system (including steel pile and against) under the unit is "copper/ton Larsen".
đang được dịch, vui lòng đợi..
