FIS acquire and edit the following details:a. the "perfect operating conditions test": The speed is approximately as follows: TSC: 10s/transaction, CN: 11s/transactions in optimum conditions of the infrastructureLine parameters should be measured and recorded left to do reviews of analysis resultsb. the "performing", FIS edit as follows: 1. the need to prepare in advance: -the data on the under 1000 documents, -16 USER account has the right to consult the documentation-Test scripts for automated testing tools for performance lookup functions documentary information.2. Perform the test run script prepared in 1 workstation in TSC, CN. Noting again the time taken in the context of the transaction on the
đang được dịch, vui lòng đợi..
