6.1. Routine maintenance:
Anytime, managers use work or someone else detect minor damage of the works must be carefully considered in order to conduct application-level maintenance, for maintenance policy 2 lead levels only apply maintenance are:
- maintenance, maintenance (level 1).
- minor repair (level 2).
If the detection of major damage, it must apply unscheduled maintenance mode (section 6.3).
Note: some parts, building structure damage occurs is included in section 7, assist the user works with the consideration detect failures to apply the maintenance level.
đang được dịch, vui lòng đợi..