Execution of test 3 position to test the ability to operate and capable of building the hammer in the strata, however while operating at full capacity, but the depth closed only achieved 27.84m, 28.44m and 28.54m, still not reached the design depth 29.04m. Simultaneously machine constantly having problems with the gas system, the voltage due to overload.