Based on the actual situation in the construction field, to minimize the duration of work section of the dam top of the pile for items (Tunnel openings, Wall tunnel openings, wall and flood pumping) and to save costs for the project, the contractor Please propose a box head piles of burned on the top at the top of the pile in contact with si cylinder sneaks of the piling and still keep local compression resistant steel mesh.With the above proposals will not affect the quality of the piles as well as the technical requirements of the project but also accelerate the progress to be made for items.