The water level for the project is the city's water source. Expected water supply part will be extracted through 1 diameter pipe D100 D150-from the city's water supply pipe network on Nguyen Thanh led into reservoirs of block houses then being pumped onto the roof by high pressure pumps. Then, the water being distributed by the HDPE pipe diameter D50-D110 roads to areas within the project. Water supply pipe is going in the box techniques, on the ceiling, wall or floor in the underground. Diagram of the domestic water supply system as follows:
đang được dịch, vui lòng đợi..