Location of the ramps leading to the tunnel, then wait for the design and construction of the road to avoid). So, the enterprises bridge 17 would like to announce in early April 2015 after finishing transfer bridge railings to crank your CO3 then we raised the No. 3 drilling lines for bored piles construction for the project.
đang được dịch, vui lòng đợi..
