The construction of turbine foundations step:Step 1: locate the location of the pile. Use the navigation frame, hanging hammers incorporate cranes on barges to pile to the design depth.Step 2: install planking, reinforcement steel pile head link before you proceed to pour the concrete pile head button. Install floor systems, planking reinforced nails, nail pedestal pedestal and Foundation stock. Reinforcement of foundations are machined and installed at the school according to the design drawings. Reinforcement must be shaved (if any) before put into use.Step 3: Pour the concrete foundations of the turbine head. The pouring process divided in several waves, combined installation, calibrate the correct link bolts round high-process design. Poured concrete foundation pad is complete proceed to install planking and poured concrete foundation stock. In the process of construction using cranes, concrete mixers, concrete pumps, concrete dam ... on barges.