In many years of work in the field of mechanical maintenance, repair, and maintenance of I've got a lot of experience in the job. Once I was given the task to find the cause of error shutdown of hybrid B3516 diesel generator. At this point the machine just runs about fifteen minutes of air cooling high water temperature alarm and air being shutdown. I have to work directly with other parts and equipment suppliers to find causes of errors in two days time. I write down the goals and plan details. Means I create things I really like, and they have been I think smoothly. Then I step by step implementation of the objectives in the given time frame and try to complete them on time. I have viewed the document and set out plans to remove the check. I want to create a blueprint and put out but the question for the error on the machine. Remove the check to b. weld cooling, water cooling, fan sensor false alarm and combustion chambers for leaks or cracks. The results I have seen born South Korea lead to clogged cooling the combustion chamber cracked creating air bubbles when the machine runs at high temperatures. I must work directly v
đang được dịch, vui lòng đợi..
