TBA 110kV EnShi Railway Station transformer design is human, so do not require TBA control system to achieve the following:The terminal computer control system allows the execution of these tasks to control and monitor the operation station equipment at the same time perform the functions (RTU or gateway) and communication center of HT North (A1).
đang được dịch, vui lòng đợi..
