According to information from briefings week with investors, the work clearance area is completed before 05/10/2015. However, until today 09.06.2015, the removal of obstacles in the top positions is still incomplete. Meanwhile contractors Enterprise 17 players still must maintain personnel and apparatus for drilling systems available to construction. Similarly area Nhue delaying bridge relocation obstacles in demand has slowed Nhue 5 months than expected (We received information obstructions are displaced in May 11/2014).
The slow obstacles at positions 02 on causing us great pressure on employment deployment:
1. Making construction plans are constantly changing positions including construction, construction progress as well as the transfer of construction materials and equipment.
2. Consumable costs by waiting machine or machines and construction materials are not used scientific, reasonable. At the same time we still have to consumable costs to maintain the school as protection, safety, sanitation, construction of auxiliary etc.
We understand that the issue of the work site is out of control however our control
to negate the problems mentioned above, we would like to propose to the prime contractor DLM some following contents:
1. To be clear, while relocation obstacles with investors at each location construction. This decision is the construction plan of our contractors are not passive.
2. With characteristics of obstacles, we expect that the mobilization of construction equipment is conducted only when the new position is grounds clean, this content is applicable to the new fence position strapless RR2 example, RR3, the lower section of the slope down to the cellar, or the position has not yet completed the relocation of obstacles.
3. We propose in the near future if the obstacles displaced in the region to offer Po The lower slopes and Y-bridge could not be deployed, after completing 4 of cylindrical pile contractors P13 Bre17 for permission to move the drill line 1 go elsewhere (out of the project) to avoid wasting money and time; Contractors will mobilize drilled back line as soon as the site was handed over clean ground from contractors Daelim