-Concrete foundations With large blocks, is to ensure the technical requirements shall be allowed after 7 days dismantling formwork.-Adhesion of concrete and formwork increase over time so that after 7 days, the dismantling formwork difficult (for normal nail, then after 1-3 days is probably scrapped formwork okay). So when the erection of formwork construction notes stick oil use for formwork